Methodology

Last updated

Definitions and formulas

Term Formula
Annual billable hours working weeks × weekly hours × billable % ÷ 100
Annual revenue requirement owner compensation target + annual business overhead
Base hourly reference revenue requirement ÷ annual billable hours
Buffered hourly reference base hourly × (1 + contingency markup % ÷ 100)
Project / package reference buffered hourly × estimated hours

For an hour range, both endpoints are calculated with the same assumptions.

Markup versus margin

The contingency is a markup on cost, not a profit margin. A 10% markup on a $100 base gives $110; the $10 buffer is about 9.1% of the price. A margin of m would require price = cost ÷ (1 − m). The calculator does not offer a margin mode.

Billable capacity

The billable percentage accounts for non-billable working time such as sales, admin, and learning. Vacation and holidays are handled through the number of working weeks.

Rounding

All values keep full JavaScript double precision internally. Only displayed currency is rounded to the nearest cent (US dollars). Billable hours are displayed with up to two decimals.

Input limits and validation

Input Allowed range
Compensation, overhead $0 – $10,000,000 (their sum must be above $0)
Working weeks 1 – 52
Hours per week 1 – 100
Billable % 1 – 100
Markup % 0 – 200
Project hours 0.25 – 10,000; minimum ≤ maximum

Empty fields are errors, never treated as zero. The calculator never shows a result for invalid input.

Worked example

$80,000 compensation + $20,000 overhead = $100,000. 50 weeks × 40 hours × 50% = 1,000 billable hours. Base: $100. With a 10% markup: $110. A 20-hour project: $2,200. A 15–25 hour range: $1,650–$2,750.

What the calculator excludes

Personal and self-employment taxes, state or local taxes, benefits, payment processing fees, direct project costs, demand, client value, and retainer terms. It produces a cost-and-capacity reference, not a market price or financial advice.

How templates and examples are checked

Templates are reviewed for complete sections, clear placeholders, and absence of hidden metadata. Numerical examples in guides are recomputed with the same formulas before publication.